Valley Center Spur corridor safety and connectivity
Summary
The short but critical I-90 underpass connection has been stabilized for cars since 2019 signals went in, but still has no sidewalks or bike facilities. A near-term pedestrian signal at Frontage Road and a longer-term feasibility study are the leading next steps.
At a glance
- Total mentions
- 2
- Last 30 days
- 0
Last discussed Jun 24, 2026.
Impact analysis
Costs not yet determined; a feasibility study and pedestrian signal would require local funding and railroad coordination.
Pedestrians and cyclists currently crossing Frontage Road on foot, plus emergency response connectivity.
Mentions & discussions (2)
062426 Gallatin Valley MPO TPCC Meeting Minutes - Jun 24, 2026
The short corridor under I-90 connecting Valley Center Road to Frontage Road has no sidewalks or bike facilities, yet lots of cyclists use it anyway. A report lays out options: a pedestrian signal at Frontage Road, better lighting, and eventually a feasibility study — complicated by railroad right-of-way and multiple jurisdictions.
061026 Gallatin Valley MPO TTAC Meeting Minutes - Jun 10, 2026
The short but critical I-90 underpass connection has been stabilized for cars since 2019 signals went in, but still has no sidewalks or bike facilities. A near-term pedestrian signal at Frontage Road and a longer-term feasibility study are the leading next steps.
We'll email you when it's on an upcoming agenda and when it's voted on, at most once a day.
The weekly brief for Bozeman
What the council decided, in plain English — one email a week.
Free. Unsubscribe with one click any time. We never sell your email.